Maxis GABS PROJECT
BTS 3900 & DBS 3900 (LTE)
- Conducted engineering site survey- Survey indoor and outdoor to propose swap existing 2G & 3G to LTE
- After survey report approved, Install equipment at site according to survey report
- Migrate existing system to new technology LTE to upgrade the system
- Prepare user acceptance test document to client before handover
- After survey report approved, Install equipment at site according to survey report
- Migrate existing system to new technology LTE to upgrade the system
- Prepare user acceptance test document to client before handover
FOCUS POINT (REPEATER & BOOSTER)
- Survey the coverage area to place the receiver & booster
- Install the equipment after the survey has been approved by the branch manager
- Perform the testing using the phone to make sure the signal meet the standard
- Install the equipment after the survey has been approved by the branch manager
- Perform the testing using the phone to make sure the signal meet the standard
FibreComm Network - INSIDE BUILDING FIBER OPTIC CABLE LAYING
- Review planning and design then proceed with engineering site survey.
-
Once the survey report has been approved, then fiber optic cable laying take place.
- Terminate both end to end fiber optic cable at FTB ( fiber termination box).
- Performed testing & commissioning on the ï¬Âber optic cable to make sure there are no losses
- Prepare final documentation for customer before hand over.
-
Once the survey report has been approved, then fiber optic cable laying take place.
- Terminate both end to end fiber optic cable at FTB ( fiber termination box).
- Performed testing & commissioning on the ï¬Âber optic cable to make sure there are no losses
- Prepare final documentation for customer before hand over.
Digi - SIAE (SM)
- Conducted engineering site survey
- Install IDU & ODU after all technical site survey has been approved
- Do alignment, perform testing and commissioning after the installation completed
- Prepare the acceptance test document and hand over to customer
- Install IDU & ODU after all technical site survey has been approved
- Do alignment, perform testing and commissioning after the installation completed
- Prepare the acceptance test document and hand over to customer